Friday, November 6, 2009

Phase 2




Power washing is one thing, sandblasting another. What a messy job! The hull was so thin in places we blew holes through it. It was determined that 2/3rds of the bottom steel had to be replaced. We also extended and enclosed the cabin. A handrail was added to the foredeck. This is how the boat looked January '08'. Keith quickly learned he needed to become good at welding or become expert at grinding.